SMV / SAM Calculator

Calculate garment standard minutes, production capacity, and estimated labor cost using your operation time study.

01. Production Settings

100% represents normal performance.
For personal needs, fatigue and unavoidable delays.
Total scheduled shift duration.
Expected production efficiency.
Operators assigned to production.
Enter your local hourly labor cost.

02. Garment Operation Breakdown

Enter the observed time for each operation in seconds. You can add as many operations as needed.

Operation Observed Time (sec) Rating (%) Normal Time (min) Allowed Time (min) Action
0.333 0.392
0.583 0.686
0.500 0.588
0.417 0.490

Your Calculation Results

Total SMV / Normal Time
1.833
Minutes per garment
Total SAM
2.156
Allowed minutes per garment
Hourly Capacity
16.70
Garments per operator per hour
Daily Team Capacity
1,603
Garments per shift at target efficiency
Labor Cost per Garment
₹3.59
Based on hourly labor cost and SAM
Total Operations
4
Included in this calculation
Formula: Normal Time = Observed Time × Performance Rating ÷ 100.
SAM: Normal Time × (1 + Allowance ÷ 100).
Production Capacity: Available operator minutes × Target Efficiency ÷ SAM.
Labor Cost: SAM ÷ 60 × Hourly Labor Cost.

Important: This calculator applies allowances as a percentage of normal time. Some factories calculate allowances using a different convention. Use your factory’s approved method when preparing official costings.