Garment Manufacturing Tool

CM Cost Calculator

Calculate garment Cut & Make costs, factory overhead, and your estimated manufacturing price in a few simple steps.

01 Order Details

Changes the displayed currency only; no exchange conversion is performed.
Total number of garments in the order.

02 Labor Cost

Standard Allowed Minutes needed to make one garment.
Hourly labor cost in your selected currency.
Use actual factory efficiency, such as 50%, 60%, or 75%.
Overhead as a percentage of the calculated labor cost.
Labor formula: SAM ÷ 60 × hourly labor cost ÷ factory efficiency. For example, 60% efficiency is entered as 60, not 0.60.

03 Additional Manufacturing Costs

Fabric spreading, cutting labor, and related cutting expenses.
Thread trimming, pressing, checking, and finishing.
Polybagging and basic packing labor or materials.
Any additional cost not included above.
Enter only the costs you want included in this CM estimate. If your factory overhead already includes cutting, finishing, or packing, avoid counting those costs twice.

04 Profit & Pricing

Profit as a percentage of the final selling price, not a markup on cost.
Price formula: Total manufacturing cost ÷ (1 − profit margin). A 20% margin means the profit is 20% of your selling price.

CM Cost Summary

Your estimated manufacturing cost and selling price.

CM Cost per Garment
₹0.00
Before profit
Total Order CM Cost
₹0.00
For the complete order
Suggested Selling Price / Garment
₹0.00
Based on your profit margin
Cost Component Cost per Garment
Direct Sewing Labor ₹0.00
Factory Overhead ₹0.00
Cutting ₹0.00
Finishing ₹0.00
Packing ₹0.00
Other Costs ₹0.00
Total CM Cost ₹0.00
Estimated Profit per Garment ₹0.00
Suggested Selling Price ₹0.00
Estimated Total Order Revenue
₹0.00
Estimated Total Order Profit
₹0.00
Labor Minutes per Garment
15 min

Important: This calculator provides an estimate, not a factory quotation. Actual costs depend on garment construction, SAM accuracy, line balancing, wages, factory expenses, order complexity, and the scope of work. Fabric and trims are not included unless you enter them under additional costs.

Ready to Manufacture Your Designs?

Get professional garment tech packs with measurements, construction details, and a bill of materials.

Explore Tech Pack Services →